Volume - 13 | Issue-1
Volume - 13 | Issue-1
Volume - 13 | Issue-1
Volume - 13 | Issue-1
Volume - 13 | Issue-1
For many complex mechanical engineering systems, including oilfield equipment, one of the characteristic features is the specificity of the installation of machines and units at the site of operation. Installation works include: assembly of machinery and equipment at the site of operation, installation of them in the working position at the design site, connection of mechanisms into technological lines, as well as the performance of auxiliary, fitting and other operations. Particularly specific are the requirements for the installation suitability of engineering objects, which are characterized by repeated dismantling and assembly and dismantling and assembly work with periodic relocation of equipment to new points of operation. So, for example, in accordance with the specifics of well drilling, drilling rigs go through the following stages of the operation cycle: construction and installation of drilling rigs, testing of a set of equipment, drilling, installation and testing of wells. Then dismantling and transportation of units to a new place of operation. [Kerimova, 2000]